Well beyond this right now
2011-12-16 20:46:14.743496+00 by Dan Lyke 2 comments
Well beyond this right now, but taking a breather to post early morning pix: http://www.flutterby.net/2011-12-15_Workshop_Progress
2011-12-16 20:46:14.743496+00 by Dan Lyke 2 comments
Well beyond this right now, but taking a breather to post early morning pix: http://www.flutterby.net/2011-12-15_Workshop_Progress
comments in ascending chronological order (reverse):
#Comment Re: made: 2011-12-16 23:45:49.526404+00 by: m
Can't wait to see the finished inside. What kind of electrical service do you plan for the shop?
#Comment Re: made: 2011-12-17 01:30:58.297513+00 by: Dan Lyke
100A panel, 4gang sockets w/2 circuits each, alternating on 4' centers, so within 4' of wall you'll be able to get to 4 circuits. All on 12ga wire. 3 220 sockets (use to be determined, on 10ga wire), two ceiling drops (still need to find those fixtures).
Sockets at 47" high, 5-20 style. I should post pix of wiring in progress.