Today's progress
2011-12-18 01:16:14.894133+00 by Dan Lyke 5 comments
Today's progress, preliminary door, wiring. http://www.flutterby.net/2011-12-17_Workshop_Door_and_Wiring
2011-12-18 01:16:14.894133+00 by Dan Lyke 5 comments
Today's progress, preliminary door, wiring. http://www.flutterby.net/2011-12-17_Workshop_Door_and_Wiring
comments in ascending chronological order (reverse):
#Comment Re: made: 2011-12-19 15:49:57.177621+00 by: Larry Burton
Nice conduit bends.
#Comment Re: made: 2011-12-21 00:18:20.702883+00 by: Dan Lyke
Thank you. There's one stretch there that I had to bend 4 times to get a kink-free set of curves... Compound curves are a bitch.
#Comment Re: made: 2011-12-22 05:02:15.537487+00 by: jeff
Looking like progress, Dan!
#Comment Re: made: 2011-12-25 17:42:25.588532+00 by: m
Good idea on the sliding door. I have a double without a median strip, but it is too short to get any lifting equipment in. Getting an 800lb lathe out will be a bitch, but I will probably be dead when that happens.
#Comment Re: made: 2011-12-25 17:56:18.359373+00 by: m
Very nice wiring. I am sorry to say that I have pretty much the same arrangement of 120V. Two circuits down each long wall with 4 socket boxes every 8' alternating every 4' in conduit. I still have to use more extension cords and outlet expanders than I am happy with. I suspect that if I had a wall of nothing but outlets, it wouldn't be enough. Sigh.